Genuine and Original OEM Fuel Filter for Honda KRHW XR125/XR150 Series | PA6 Housing & Ansei Paper

Contact Us
SPECIFICATION
Global Trade Division
Core Material
Filtration Precision
Burst Pressure
Corrosion Resistance
Ethanol Resistance
Operating Temperature
Flow Resistance
☞ Housing: Polyamide 6 (PA6-GF30) Filter Media: Asahi Glass Fiber Paper (5μm) Adhesive: Kebo KB-45 (Japan)
☞ 20μm (Initial Efficiency ≥80%)
☞ ≥1.8MPa (Competitors ≤1.2MPa)
☞ 72h Salt Spray Zero Rust
☞ E10 Immersion 500h Zero Swelling (Competitors Fail at 200h)
☞ -20°C to 80°C
☞ ≤0.5kPa @1L/min (Competitors ≥6kPa)
DESCRIPTION
KEY FEATURES

💡 Honda OEM DNA
Designed for XR125/XR150—passes 10,000km road tests, 0.015% failure rate (industry: 1.5%).
💡 Dual-Action Filtration Revolution
5μm fine filtration + 95% water separation—solves contamination and moisture corrosion (critical for Southeast Asian monsoons).
💡 Armoured Housing
PA6-GF30 material with 120kJ/m² impact strength (competitors: 40kJ/m²)—300% better drop resistance.
💡 Fuel Economy Boost
42% lower flow resistance—improves fuel efficiency by 5%, saves $25/year per vehicle (at 15,000km).
COMPATIBILITY & APPLICATIONS
🏆 Core Compatible Models
🔹 Honda
XR125L, XR150L / Impact resistance + water separation
🔹 Yamaha
DT125, Serow 250 / Ethanol fuel compatibility
🔹 KTM
125 Duke, 200 Adventure / High-flow demand
🏆 Scenario-Based Solutions
🔹 Southeast Asian Delivery Bikes:
200km/day high-load filtration
🔹 South American Rainforest Rides:
95% water separation prevents rust
🔹 African Off-Road Races:
PA6 housing resists impact damage

KEY ADVANTAGES

Technical Breakthroughs & Validation
⚡ Material Revolution:
PA6 housing retains 200% higher strength at 125°C vs. competitors
(ASTM D638 tested).
⚡ Extreme Scenario Proven:
Thailand Monsoon Test: Zero leakage in 100% humidity + mud (6 months).
Kenya Red Soil Roads: 18g dirt capacity at 22g/m³ dust (competitors fail at 12g).
PRODUCT SHOWCASE
PACKAGING & PAYMENT

TAIYO GIKEN
GLOBAL SERVICE
📦 Factory Standard Export Packaging
📞 Customisation Services
We support OEM logo printing and non-English manual adaptation for all components. For framework details, please refer to our Custom Solutions section.
Contact our commercial team for specific requirements.
🚚 Standard Lead Times
After deposit receipt:
🌐 Stock items: Dispatch within 24 hours
🌐 Non-stock items:
- Prototypes/first articles: 1-2 Weeks
- Bulk production: 30 days (Repeat Orders: 30-60 days)
- Tooling development: +15 days. Production: +2-3 weeks post-approval
💡 Expedited options available – consult our commercial team.
💳 Payment Terms
Two standard options:
🔒 35-50% telegraphic transfer (T/T) deposit + balance before shipment
🔒 100% irrevocable letter of credit at sight (L/C) from approved banks

COMPNAY OVERVIEW




CERTIFICATES & PATENT
Frequently Asked Questions
RELATED HOT SALE PRODUCTS
DIVISIONS
Global Trade Division
Commercial Solutions Division
Strategic Partnerships Division
Technical Solutions Division
DIVISIONS
Global Trade Division
Commercial Solutions Division
Strategic Partnerships Division
Technical Solutions Division






































